Disassembly sequencing in the regeneration of complex capital goods
- authored by
- Torben Lucht, Tammo Mimken Heuer, Peter Nyhuis
- Abstract
Despite constantly increasing condition monitoring parallel to operation, maintenance, repair & overhaul (MRO) processes in the regeneration of complex capital goods are still characterised by a high degree of uncertainty regarding the capacity and material demands to be expected from a regeneration order. In order to meet the committed delivery times and dates, the disassembly at the beginning of the regeneration supply chain is of particular importance for the performance of the entire downstream regeneration process. High potential for improving logistical performance lies in an intelligent and logistics-oriented sequencing strategy in disassembly. In addition to technical-physical boundary conditions, the interaction of the disassembly process with downstream process steps and additional other control measures must also be taken into account. The logistical description and evaluation of the sequencing-oriented measures for improving the logistical performance of disassembly in the context of the regeneration of complex capital goods makes their modelling a necessary prerequisite and basis. This paper presents a basic logistical design and modelling approach.
- Organisation(s)
-
Institute of Production Systems and Logistics
CRC 871 Regeneration of Complex Capital Goods
- Type
- Conference contribution
- Pages
- 12-20
- No. of pages
- 9
- Publication date
- 2020
- Publication status
- Published
- Peer reviewed
- Yes
- ASJC Scopus subject areas
- Industrial and Manufacturing Engineering, Mechanical Engineering, Management of Technology and Innovation, Strategy and Management
- Sustainable Development Goals
- SDG 9 - Industry, Innovation, and Infrastructure
- Electronic version(s)
-
https://doi.org/10.15488/9642 (Access:
Open)