Bereitstellung von Regelleistung mit einer Photovoltaikanlage

authored by
Jonathan Blanz, Volker Wachenfeld, Jens Friebe, Stijn Stevens
Abstract

The method involves connecting an inverter (3) with an alternating current (AC) network (4). The electric current signals (12) are transferred between photovoltaic generator (2) and AC network using the inverter in accordance with an acquired power control signal (6) comprising positive and negative dynamic power control signals (14,15) by network operator (5).

Organisation(s)
Institute of Drive Systems and Power Electronics
External Organisation(s)
SMA Solar Technology AG
Type
Patent
Publication date
28.03.2013
Publication status
Published
Sustainable Development Goals
SDG 7 - Affordable and Clean Energy
Electronic version(s)
https://worldwide.espacenet.com/patent/search?q=pn%3DWO2013041534A2 (Access: Open)
https://worldwide.espacenet.com/patent/search?q=pn%3DJP2014530588A (Access: Open)
https://worldwide.espacenet.com/patent/search?q=pn%3DEP2759033B1 (Access: Open)
https://worldwide.espacenet.com/patent/search?q=pn%3DWO2013041534A3 (Access: Open)
https://worldwide.espacenet.com/patent/search?q=pn%3DCN103843217A (Access: Open)
https://worldwide.espacenet.com/patent/search?q=pn%3DUS2014204613A1 (Access: Open)
https://worldwide.espacenet.com/patent/search?q=pn%3DEP2759033A2 (Access: Open)
https://worldwide.espacenet.com/patent/search?q=pn%3DDE102011054971A1 (Access: Open)