Integrierte Entwurfs- und Betriebsmethodik für Offshore-Megastrukturen

authored by
Daniel Schuster, Christian Hente, Clemens Hübler, Raimund Rolfes
Abstract

Integrated design and operation methodology for offshore megastructures. The collaborative research centre 1463 “Integrated Design and Operation Methodology for Offshore Megastructures” was established by the German Research Foundation in January 2021 for an initial period of four years. In 15 sub-projects, researches from five institutions under the leadership of Leibniz University Hannover are investigating and developing new methods to realize future offshore wind turbines with a rated power of > 20 MW as a significant contribution to a renewable energy supply.

Organisation(s)
Institute of Structural Analysis
Type
Contribution in non-scientific journal
Journal
BAUTECHNIK
Volume
98
Pages
563-570
No. of pages
8
ISSN
0932-8351
Publication date
13.08.2021
Publication status
Published
ASJC Scopus subject areas
Civil and Structural Engineering, Building and Construction
Sustainable Development Goals
SDG 7 - Affordable and Clean Energy
Electronic version(s)
https://doi.org/10.1002/bate.202100044 (Access: Closed)